Job sequencing Problem
Pattern: Activity selection
Each job takes one unit of time and pays its profit if finished by its deadline. Take jobs from most to least profitable, and put each in the latest free time slot at or before its deadline; skip it if none is free. Return the number of jobs done and the total profit.
The problem
Each job is [id, deadline, profit]; a job takes one unit of time, only one job runs at a time, and a job counts only
if it finishes by its deadline. Return [number of jobs done, total profit] for the largest total profit.
[[1, 4, 20], [2, 1, 10], [3, 1, 40], [4, 1, 30]] gives [2, 60].
Think first
- Which job should get first claim on a slot?
- Which slot should it take?
- Why not the earliest free slot?
Hints
Brute force, and why it fails
Try every subset of jobs and check it can be scheduled: O(2ⁿ × n).
The key insight
Profitable jobs first, each placed as late as possible, never blocks a job that could have fitted, so the greedy keeps the best total.
Dry run
| order | 3 4 1 2 |
|---|
Jobs (id, deadline, profit): (1, 4, 20), (2, 1, 10), (3, 1, 40), (4, 1, 30). By profit: 3, 4, 1, 2.
The plan
sort jobs by profit, highest first
used = [false] * (maxDeadline + 1)
for job: for t from job.deadline down to 1: if not used[t]: use it; count += 1; profit += job.profit; break
Complexity
- Time
O(n log n + n × D)- Space
O(D)
Sorting, then each job scans at most D slots, where D is the largest deadline. A union-find of free slots makes it near O(n log n).
Edge cases
- All deadlines 1: only the most profitable job.
- Deadlines larger than the number of jobs.
- One job.
I've built my logic, show the code
Java
import java.util.*;
class Solution {
public int[] JobScheduling(int[][] jobs) {
int[][] byProfit = jobs.clone();
Arrays.sort(byProfit, (a, b) -> b[2] - a[2]); // most profitable first
int maxDeadline = 0;
for (int[] j : jobs) maxDeadline = Math.max(maxDeadline, j[1]);
boolean[] used = new boolean[maxDeadline + 1]; // used[t]: slot t (from t - 1 to t) is taken
int count = 0, profit = 0;
for (int[] j : byProfit) {
for (int t = Math.min(j[1], maxDeadline); t >= 1; t--) { // the latest free slot before its deadline
if (!used[t]) {
used[t] = true;
count++;
profit += j[2];
break;
}
}
}
return new int[]{count, profit};
}
}C++
class Solution {
public:
vector<int> JobScheduling(vector<vector<int>>& jobs) {
vector<vector<int>> byProfit(jobs);
sort(byProfit.begin(), byProfit.end(), [](const vector<int>& a, const vector<int>& b) { return a[2] > b[2]; });
int maxDeadline = 0;
for (const vector<int>& j : jobs) maxDeadline = max(maxDeadline, j[1]);
vector<bool> used(maxDeadline + 1, false); // used[t]: slot t (from t - 1 to t) is taken
int count = 0, profit = 0;
for (const vector<int>& j : byProfit) { // most profitable first
for (int t = min(j[1], maxDeadline); t >= 1; t--) { // the latest free slot before its deadline
if (!used[t]) {
used[t] = true;
count++;
profit += j[2];
break;
}
}
}
return vector<int>{count, profit};
}
};Python
class Solution:
def JobScheduling(self, jobs: list[list[int]]) -> list[int]:
max_deadline = max(d for _, d, _ in jobs)
used = [False] * (max_deadline + 1) # used[t]: slot t (from t - 1 to t) is taken
count = profit = 0
for _, deadline, p in sorted(jobs, key=lambda j: -j[2]): # most profitable first
for t in range(deadline, 0, -1): # the latest free slot before its deadline
if not used[t]:
used[t] = True
count += 1
profit += p
break
return [count, profit]Common mistakes
- Taking the earliest free slot.
- Sorting by deadline instead of profit.